We're thrilled to share our latest project involving the digging of a 4ft trench as part of an electrical upgrade. Our task was to relocate a 200amp electrical pedestal, a critical component for ensuring robust power supply to the client's site.
This project required careful planning and precision. We utilized our equipment to create a neat trench, adhering to safety and efficiency standards. The challenge was to ensure that the path was optimal for laying 3" schedule 40 PVC piping. Our team managed this with expertise and precision.
Furthermore, coordination with utility services was key. They contributed by adding 1/0 aluminum feeders into the trench. To support this infrastructure, we supplied and placed a concrete hand hole for future cable splicing needs.
This project is a testament to our commitment to quality work in electrical upgrades. Completing it required teamwork and precision, and we are proud of the work we accomplished.